Risk and safety management

The costs associated with eliminating hazards and threats at their source are incomparably lower than those required for resolving a major incident. We identify potential risks at the design stage to ensure appropriate safety measures are in place before construction and operation begin.

For the analysis of hazardous situations in a project, we conduct interdisciplinary workshops: HAZOP/HAZID, SIL, LOPA, Design Analysis, Safety in Design Review, Constructability Review, and others.

Having key specialists and experts in each KMGP discipline with over 15 years of experience in capital projects allows us to identify all possible risks with a high degree of confidence, determine their consequences, and implement effective solutions to prevent accidents or reduce the impact of their consequences.